WSAA Embedment Sand
Authority-grade embedment sand, including certified recycled PS 368, with compliance attached to every load.
About this product
Water authorities specify embedment materials by WSAA product specification, and sand is no exception: grading, durability and contamination limits all apply. We supply compliant embedment sands including WSA PS 368, the recycled-sand specification that lets infrastructure projects hit sustainability targets without compromising the asset.
Certificates travel with the material, and the digital docket trail in NXT Control gives your handover documentation a head start. For rock-based embedment see our WSA 361 and 362 products.
Specifications
| Material type | WSAA embedment sand |
|---|---|
| Specification | To WSAA product specification (incl. recycled, WSA PS 368) |
| Use context | Water and sewer pipe embedment |
| Source | Quarried or certified recycled |
| Typical density | ~1.4 to 1.6 t/m³ (indicative) |
| Common uses | Pipe embedment and surround for water authorities |
Figures shown are indicative typical properties and vary by source and batch; details and conformance for your delivery are available on request.
Use cases
Supply & delivery
By the tonne
Supplied loose in bulk and delivered by tipper, sized to your access and the day’s program.
Screened & washed
Screened and washed to a clean, consistent grade, batch to batch.
Docs on request
Conformance and certificates supplied for specified sands on request.
Live in NXT Control
Every load GPS-tracked from the yard to your gate, with the tonnes on the docket.
How much do you need?
Sand is supplied by the tonne. As a guide it weighs around 1.5 tonnes per cubic metre, so multiply your area by the depth for the volume, then by the density. Tell us the job on the quote form and we will work out the tonnes and price the delivery.
50 m² × 0.15 m deep = 7.5 m³ × ~1.5 t/m³
Common questions
Is this WSAA compliant?
Is there a recycled option?
How is it delivered, and can I track it?
Need rates for WSAA Embedment Sand?
Tell us the volume, the site and the program. Every load is tracked live through NXT Control, from yard to your gate.