Home Products Guides Company Projects Service Areas Social Procurement FAQ NXT Control Get a Same-Day Quote Call Us Drive for Us NXT Control
NXT Control · our platform

Your entire supply chain. In your pocket.

Every NXT Quarry client receives NXT Control, a supply management platform built from scratch for civil materials. Live trucks, live volumes, live spend. No phone calls, no paper, no waiting.

Included with every account. Not sold separately.

NXT Control app showing live truck tracking for the Donnybrook Road Upgrade project, registration, status, material and tonnes for each delivery

Surely you know by now this is going to be good.

You've scrolled this far. The phone is faster.

Why it exists

We went looking for software that understood civil supply. It didn't exist. Everything we found was a freight tool wearing a hi-vis vest. So we spent months building our own, from the ground up, for exactly this industry.

Purpose-built · In-house · Civil only
The dashboard

Everything, in one place.
Always visible.

The whole job in a single live view, scheduled, on the way, delivered, tonnes this month, weather, recent orders and your account. The office sees exactly what the site sees.

NXT Control desktop dashboard showing scheduled, on-the-way and delivered loads, tonnes this month, live deliveries, a weather warning and recent orders

NXT Control · customer dashboard

01 · Live tracking

Every truck.
In real time.

Track every vehicle from quarry to site. Registration, material, tonnes and ETA, all visible the moment it updates. In transit, loading, delivered: you see it the second it changes.

Donnybrook Road Upgrade · 5 trucks today

NXT Control live trucks screen listing each registration, status, material and tonnes with live ETAs
02 · On the map

Watch it move.
To the metre.

Every truck GPS-tracked on a live map, from quarry pickup to your gate. Tap a vehicle for its load, status and ETA, so you plan around where the truck actually is, not where it's meant to be.

1MX-4PB · Crushed Rock 20mm · updated 2s ago

NXT Control live map view showing a GPS-tracked truck approaching the Donnybrook Road Upgrade site with load and ETA
03 · Every run logged

Every run.
Every tonne. Logged.

Open any truck to see its full day: departed quarry, arrived site, unloaded, with times and tonnes against every run. The delivery record builds itself, so reconciliation isn't a job anymore.

1JK-7AC · 3 runs · 102 t today

NXT Control truck detail showing each run for the day with departed, arrived and unloaded timestamps and tonnage
Financial transparency

Know exactly what you owe.
To the dollar.

Log in any time and see the truth: credit limit, outstanding, overdue, invoiced versus paid, and a full monthly statement. Synced live with our accounts. No surprise bill at month end.

NXT Control account dashboard showing credit limit, total outstanding, overdue balance, credit usage, an invoiced-versus-paid chart and a monthly statement

NXT Control · account & statements

Proof of delivery

Every load, signed off.
On the record.

Scheduled, on the way, delivered. Each load shows its window, site address and live status. Every delivery is signed off digitally with a docket you can open any time. No paper to lose.

NXT Control order tracking showing loads grouped by on the way, scheduled and delivered, each with site address, time window and a view docket button

NXT Control · order tracking & dockets

Reporting

The reports write themselves.

Volumes by product, deliveries by day, spend by project, generated from the same live data your site already produced. Export what you need, when you need it.

NXT Control reports view showing delivery and volume reporting across a project

NXT Control · reports

New · Volume intelligence

It knows how your order
will finish. Before it does.

As every truck delivers, NXT Control recalculates the estimated finish volume of your order, constantly. If the forecast drifts from what you requested, the schedule adjusts so the final load lands you as close as possible to the exact tonnage you asked for.

No more over-ordering to be safe. No more short loads discovered at the end. The platform manages the order. You just watch it land.

Volume forecastRECALCULATING
Road Base 20mm
Donnybrook Road Upgrade · Order #1042
Delivered
0 t
Requested
300 t
Forecast finish
0 t
Forecast updated after every load · last truck resized to close the gap
Who it serves

One platform. Three jobs
it quietly does.

Directors & owners

The numbers, live

Spend, volumes and account position across every project, without waiting on reconciliations or end-of-month reporting. The truth, whenever you want it.

Project managers

The program, protected

Forward delivery schedules, live ETAs and built-in supply redundancy. When something moves, you know before it becomes tomorrow's problem.

Site managers

Zero phone calls

Where's the truck, what's on it, when does it land. All answered on your phone, not over the two-way. One contact if you ever need a human.

Your whole team

Everyone sees what
they need. Nothing else.

Add your own people, supervisors, accounts, procurement, each with the right level of access. The information stops living in one person's phone.

01

Live GPS, built in

Tracking comes from the trucks themselves, not driver phone calls.

02

Synced with our accounts

What you see is what our ledger says. One source of truth, always current.

03

Digital dockets & sign-off

Every delivery confirmed on glass, stored forever, exportable any time.

04

Always improving

Built and developed in-house, so every account gets every improvement automatically.

NXT Control dashboard on tablet showing live project status for a site team

Built for NXT.
Wanted beyond it.

NXT Control was built to run our own supply chain. There's already interest in licensing it beyond NXT Quarry, because nothing else in the industry does what it does.

Included with every account. The only way to get NXT Control is to work with NXT Quarry.