Class 2 performance in a coarser grading, for deep lifts, heavy pavements and the layers that do the structural heavy lifting.
Class 2 40mm carries the same quality limits as its 20mm sibling, fully crushed, controlled plasticity, dense grading, but with a larger top size that suits deep-lift construction and lower base layers. The coarser skeleton gives excellent stability under construction traffic before the upper layers go down.
It’s typically placed as the lower base in thick pavement designs, on haul roads, and under crane and equipment pads where layer thickness matters. Available plain, wet-mixed or cement treated, weighed and tracked load by load.
| Material type | Fully crushed rock (FCR), dense-graded |
|---|---|
| Nominal size | 40mm |
| Specification | Supplied to VicRoads Section 812, Class 2 |
| Grading | Continuously graded, 40mm down to fines, within the Section 812 envelope |
| Source rock | VicRoads-accredited hard rock (typically basalt or hornfels) |
| Treatment options | Plain, wet-mix (at optimum moisture), or cement treated 1% to 4% |
| Typical compacted density | ~2.0 to 2.2 t/m³ (indicative) |
| Common uses | Pavement base course, hardstands, subdivision roads |
Figures shown are the supply specification and indicative typical properties. Source rock and exact test values vary by quarry; current batch test certificates for your delivery are available on request.
Full loads to open sites, sized to your access and the day's program.
Maximised payload where site access and mass limits allow it.
Every load GPS-tracked from the weighbridge to your gate, with the tonnes on the docket.
Supplied as is, wet-mixed at optimum moisture, or cement treated to your design.
As a guide, this material weighs around 2.1 tonnes per cubic metre. Multiply your area by the layer depth to get the volume, then by the density. Tell us the area and depth on the quote form and we will convert it to tonnes and price the delivery for you.
100 m² at 150 mm deep = 15 m³ × ~2.1 t/m³
Tell us the volume, the site and the program. Every load is tracked live through NXT Control, from quarry to your gate.