Inland Rail is the largest freight rail project in Australia's history. NXT Quarry is the inbound materials supplier on its Victorian works, 40,000 cubic metres and counting, feeding a railway built to move freight between Melbourne and Brisbane for the next hundred years.
Broadford + Euroa · Regional VictoriaInland Rail is a 1,600 kilometre spine of new and upgraded track connecting Melbourne to Brisbane, engineered to run double-stacked freight trains up to 1.8 kilometres long. It is one of the largest infrastructure programs this country has ever taken on, and a major stretch of it runs straight through regional Victoria, past Beveridge, Wandong, Broadford, Euroa and Benalla.
Bridges are being torn down and rebuilt for double-stack clearance. Track is being lowered under the Hume Freeway. New station platforms are going in at Euroa and Benalla. Inland Rail calls it the largest scope of works it has ever undertaken in a single rail possession.
NXT Quarry is the inbound materials supplier. 40,000 cubic metres of it.
AS4419 soil, VR720 mulch, recycled mulch, Class 3 crushed rock and fill, coordinated into a nation-building rail corridor on the kind of program where a late load is not an option. For a young company, that is a statement. For a young company that says supply is everything, it is the proof.
Inland Rail connects Melbourne and Brisbane by rail for the first time via an interior route, taking trucks off the highways and moving freight faster, cheaper and cleaner across the eastern seaboard. The Victorian section, Beveridge to Albury, is where clearances are being raised so double-stacked trains can run the whole corridor.
Project scope and figures per Inland Rail. Read the announcement.
The Inland Rail corridor, Melbourne to Albury. NXT supplies the Victorian works.
Everything from structural crushed rock to the mulch that revegetates the corridor once the trains are running, delivered to spec and on the clock.
Landscaping and garden soil certified to Australian Standard 4419, for the corridor's rehabilitation, batter and landscape works along the new alignment.
VicRoads-specification landscape mulch for erosion control and revegetation, holding the ground and locking in moisture on disturbed areas.
Recycled organic mulch, a sustainable ground cover that suppresses weeds and protects new plantings while the corridor establishes.
Class 3 crushed rock, the structural road base under access roads, hardstands and pavements across the work sites.
General and engineered fill for bulk earthworks and level-up, the volume that shapes the ground the rest of the job is built on.
If we can hold supply on Inland Rail, we can hold it on yours.
Get a Same-Day Quote →



This is exactly what NXT Quarry was built for. Big volume, tight windows, no room to get it wrong.
Tell us what you're building and how much you need. If it's the right fit, we'll make it work.