Home Products Guides Company Projects Service Areas FAQ NXT Control Get a Same-Day Quote Call Us Drive for Us NXT Control
Soil & sand

AS4419 vs VR720: which spec soil does your job need?

Two specs, two different jobs. One comes from Standards Australia, the other from VicRoads, and they are not interchangeable. Here is how to read what your spec actually wants.

Plain-English guideVictorian specs & unitsUpdated August 2026
Quick answer

AS 4419 is the Australian Standard for soils used in landscaping and garden construction. Schools, councils and landscape architects call it up on planting and garden works.

VR720 is VicRoads Section 720, the topsoil specification for road projects: batters, medians, verges and roadside revegetation. Road, rail and corridor landscape packages call it up.

Supply the one your drawings name. They are tested against different requirements and one does not stand in for the other.

Two authors, two purposes

The confusion is understandable, because both specs exist for the same underlying reason: "topsoil" with no spec behind it means whatever is in the stockpile. Both put laboratory testing between the stockpile and your site. The difference is who wrote them and what they were written for.

AS 4419VR720 (Section 720)
Written byStandards AustraliaVicRoads
Full nameSoils for landscaping and garden useVicRoads Standard Specification Section 720: Topsoil
Built forLandscaping and garden construction: planting beds, garden works, designed landscapesRoad projects: batters, medians, verge reinstatement, roadside revegetation
Typically specified bySchools (VSBA), councils, landscape architects, commercial landscape packagesRoad and rail corridor works, civil contractors on VicRoads-referenced jobs
Tested forpH, salinity (EC), organic matter, nutrients and toxicityGrading, pH, organic content and weed contamination per Section 720
Reading your spec: if the drawings reference an Australian Standard number (AS 4419), it is a landscape soil job. If they reference a VicRoads section number (Sec 720 / VR720), it is a road-spec job. Rail corridor landscape packages often use the VicRoads specs too, as the Inland Rail works in Victoria do.

Why you cannot swap one for the other

Both are tested topsoils, but they are tested against different requirements by different authorities. A batch with paperwork against AS 4419 has not demonstrated conformance with Section 720, and vice versa. The superintendent signs off against the spec named in the contract, so supplying the other one, however good the soil, leaves the paperwork unable to close.

If a substitution genuinely makes sense on your job, that is a conversation with the superintendent before the trucks roll, and it belongs in writing.

Ordering it right

Name the spec when you order, give the volume in cubic metres, and ask for the current batch test documentation with delivery. That is the entire trick. The paperwork arriving with the soil is what keeps sign-off moving, and it is why specified soil is ordered from suppliers who test, not from whoever has a stockpile.

For the broader picture of what AS 4419 covers, read What is AS4419 soil? For how VicRoads specifications work in general, see VicRoads specs explained.

Spec soil, paperwork included.

NXT Quarry supplies AS4419 and VR720 soils across Victoria, batch tested with documentation on every order. Tell us the spec and the volume.