The finishing lift, 20mm capping to seal a fill, shed water and present a tight surface for the layers above.
Capping is the transition layer between bulk earthworks and engineered pavement: a finer crushed product placed over fill or rubble to seal the surface, shed rainfall and provide a uniform platform for sub-base construction.
The 20mm grading trims and compacts to tight level tolerances, the difference between a fill that survives a wet week and one that turns to porridge. Natural or recycled supply, scheduled with your bulk material so it lands in sequence.
Tell us the volume, the site and the program. Every load is tracked live through NXT Control, from quarry to your gate.